Increasing Storm Capacity at Reduced TOTEX ESL used a collaborative challenge approach during the design phase to consider pumped flows and repurposing of a redundant holding tank. Discipline leads removed…
Read More
Reactive Works to Rectify Sewer & Rainfall Drainage Into River We utilised an innovative modular reed bed offering full flexibility to the operators and enabling fast installation through off site…
Read More
A Radical Reduction of Construction Risk & Complexity Barhale were tasked with the design, manufacture and installation of DfMA modular screen unit with mechanical winding mechanism. ESL provided the design…
Read More
Constructed Wetlands: A Nature Based Design Solution ESL rationalised the concept solution, relocating the reed bed and generating headroom in the hydraulics to remove one of the pumping stations and…
Read More
Tertiary Wastewater Treatment Tertiary treatment was necessary to support regulatory requirements for Phosphorous at <2mg/l in worsbrough but teams faced challenges; Hydraulic challenges within the existing final effluent line Spatial…
Read More
Birmingham New Street Area Re-Signalling Phase 6. Phase 6 of the above project requires the design and installation of 2 no. PSPs (Principal Supply Points). These provide a back up…
Read More
Midland Mainline Electrification ESL’s initial involvement on this project was in modest civil engineering design packages. Our success in delivering these packages on time and on budget was recognised as…
Read More
Norwich Victoria Sidings ESL acted as the specialist civil engineering subcontractor and carried out the design and build of the civil engineering works associated with the refurbishment of the sidings.…
Read More
Cornbrook Structure Assessments ESL carried out a series of surveys to the viaduct to determine the extent of the corrosion issues which had been identified and to fully dimension and…
Read More
Therapia Lane Depot Works The purpose of the power re-balancing project was to more evenly distribute the power supply between the two circuit breakers present at the depot. ESL’s scope…
Read More