Modular Mechanical Reed Bed

A Radical Reduction of Construction Risk & Complexity
Barhale were tasked with the design, manufacture and installation of DfMA modular screen unit with mechanical winding mechanism.
ESL provided the design module of this work.
A new modular unit designed to fit on 15T hiab unit and to be safely lifted in one piece directly into position in the river.
A unit was designed for rapid site works within a limited install window.
Testing was completed in a workshop, ahead of dispatch
All works could be undertaken behind edge protection measures.
Project Outcome
Full site works completed within a four hour working window.
Removed need for on site fabrication or welding over platform edge.
No wastage on-site, est. 10% reduction of fabrication wastage in factory.
Modular solution replicable at scale.
Project Details
- Client: Thames Water
- Date: 2024
- Category: Water Sector Engineering Design Solutions